This site will look much better in a browser that supports web standards, but it is accessible to any browser or Internet device.

WorkSafeBC

insurance banner

2013 - Rate Group FJ

2013 Preliminary actuarial rate: $4.51 (per $100 of assessable payroll)

Actuarial rate history:
2013:   $4.51
2012:   $4.06
2011:   $3.70

Industry group: FJ01
Classification unit:
CU # CU name 2013 Prelim 2012 Rate
721020   Pre-engineered Steel Building Construction    $4.98 $4.83
721053   Commercial Tank or Boiler Installation or Removal    $4.78 $4.72

Industry group: FJ02
Classification unit:
CU # CU name 2013 Prelim 2012 Rate
712025   Commercial Marine Vessel Manufacture, Service or Repair    $4.62 $4.12

Industry group: FJ04
Classification unit:
CU # CU name 2013 Prelim 2012 Rate
732008   Barge, Tug, or Other Water Transport of Goods (not elsewhere specified)    $3.94 $3.80

Industry group: FJ05
Classification unit:
CU # CU name 2013 Prelim 2012 Rate
721013   Construction Labour Supply or General Labour Supply (not elsewhere specified)    $4.46 $4.01

Industry group: FJ06
Classification unit:
CU # CU name 2013 Prelim 2012 Rate
714004   Custom Wood Kiln 2   $3.96 $3.60
714016   Portable Wood Mill 2   $2.82 $2.56
714028   Wood Chip Mill 2   $2.82 $2.56

1 Newly created classification unit.
2 New member for this industry group.

Note: The following classifications have either been eliminated or moved to new rate groups, as shown below.
CU # CU name New Rate Group
732024   Log Towing   GP

View the 2012 information for this rate group.

For more detailed information about this rate group see:

All rate group information