2012 - Browse the classification structure by subsector
For information about a specific classification unit (CU), select one
from the list. This will provide details of the classification unit, including
base rates for 2012 and the previous two years.
The six-digit numbers represent the CU number we assign to each classification
unit.
Sector: Construction
|
| |
Subsector: Heavy Construction
| CU name |
CU # |
2012 Rate |
2011 Rate |
| Bridge, Overpass, or Viaduct Construction or Repair |
722001 |
$5.44 |
$6.82 |
| Cut and Cover Tunnel Construction |
722009 |
$2.65 |
$2.68 |
| House Raising or Structural Moving of Buildings or Heavy Equipment |
722002 |
$5.12 |
$4.36 |
| Mechanized Tunnel Boring Construction |
722010 |
$5.24 |
$6.58 |
| Pier, Wharf, or Dry Dock Construction or Repair |
722003 |
$4.69 |
$3.94 |
| Pile Driving |
722004 |
$3.47 |
$3.92 |
| Steel Frame Erection or Structural Repair of Steel Frames |
722005 |
$11.51 |
$12.03 |
| Steel Frame Painting, Bridge Painting, or Bridge Cleaning |
722006 |
$10.44 |
$9.32 |
| Structural Concrete Reservoir, Flume, Dam, Dyke, Causeway, or Jetty Construction or Repair |
722007 |
$11.36 |
$11.78 |
| Tunnel Construction (not elsewhere specified) |
722011 |
$10.49 |
$11.77 |
|
For information on another sector or subsector, return to the previous
screen to browse the classification structure by industry
sector.