This site will look much better in a browser that supports web standards, but it is accessible to any browser or Internet device.

WorkSafeBC

insurance banner

2012 - Browse the classification structure by subsector

For information about a specific classification unit (CU), select one from the list. This will provide details of the classification unit, including base rates for 2012 and the previous two years.

The six-digit numbers represent the CU number we assign to each classification unit.

Sector: Construction

 
Subsector: Heavy Construction
CU name CU # 2012 Rate 2011 Rate
Bridge, Overpass, or Viaduct Construction or Repair 722001 $5.44 $6.82
Cut and Cover Tunnel Construction 722009 $2.65 $2.68
House Raising or Structural Moving of Buildings or Heavy Equipment 722002 $5.12 $4.36
Mechanized Tunnel Boring Construction 722010 $5.24 $6.58
Pier, Wharf, or Dry Dock Construction or Repair 722003 $4.69 $3.94
Pile Driving 722004 $3.47 $3.92
Steel Frame Erection or Structural Repair of Steel Frames 722005 $11.51 $12.03
Steel Frame Painting, Bridge Painting, or Bridge Cleaning 722006 $10.44 $9.32
Structural Concrete Reservoir, Flume, Dam, Dyke, Causeway, or Jetty Construction or Repair 722007 $11.36 $11.78
Tunnel Construction (not elsewhere specified) 722011 $10.49 $11.77

For information on another sector or subsector, return to the previous screen to browse the classification structure by industry sector.