This site will look much better in a browser that supports web standards, but it is accessible to any browser or Internet device.

WorkSafeBC

insurance banner

2009 - Browse the classification structure by subsector

For information about a specific classification unit (CU), select one from the list. This will provide details of the classification unit, including base rates for 2009 and the previous two years.

The six-digit numbers represent the CU number we assign to each classification unit.

Sector: Construction

 
Subsector: Road Construction or Maintenance
CU name CU # 2009 Rate 2008 Rate
Earth and Rock Filled Structure Construction 723010 $3.03 $3.82
Highway Maintenance (routine maintenance of all aspects of a specific section of highway) 723002 $3.15 $3.25
Highway, Road, or Parking Lot Painting 723003 $3.06 $3.25
Paving Services or Asphalt Manufacture 723004 $3.29 $3.52
Railway Construction, Maintenance, or Demolition 723005 $3.03 $3.82
Road Construction (not elsewhere specified) 723006 $3.04 $3.83
Snow or Ice Removal 723007 $3.01 $3.25
Street Cleaning 723008 $3.01 $3.25
Traffic Control 723009 $4.99 $4.85

For information on another sector or subsector, return to the previous screen to browse the classification structure by industry sector.