This site will look much better in a browser that supports web standards, but it is accessible to any browser or Internet device.

WorkSafeBC

insurance banner

2008 - Rate Group DD

2008 actuarial rate: $2.96 (per $100 of assessable payroll)

Actuarial rate history:
2008:   $2.96
2007:   $3.57
2006:   $4.21

Industry group: DD01 - General Construction
Classification unit:
CU # CU name 2008 Rate 2007 Rate
721003   Blasting or Avalanche Control    $2.98 $3.57
721017   Dredging    $2.98 $3.56
721031   Land Clearing, Excavation, or Site Surface Preparation    $2.98 $3.56
721056   Water Well, Foundational, or Directional Drilling    $2.98 $3.56

Industry group: DD02 - General Construction
Classification unit:
CU # CU name 2008 Rate 2007 Rate
721038   Oil or Gas Pipeline Construction or Repair    $3.14 $3.61

1 Newly created classification unit.
2 New member for this industry group.

View the 2007 information for this rate group.

For more detailed information about this rate group see:

All rate group information