This site will look much better in a browser that supports web standards, but it is accessible to any browser or Internet device.

WorkSafeBC

insurance banner

2007 - Rate Group DD

2007 actuarial rate: $3.57 (per $100 of assessable payroll)

Actuarial rate history:
2007:   $3.57
2006:   $4.21
2005:   $3.87

Industry group: DD01 - General Construction
Classification unit:
CU # CU name 2007 Rate 2006 Rate
721003   Blasting or Avalanche Control    $3.57 $4.22
721017   Dredging    $3.56 $4.20
721031   Land Clearing, Excavation, or Site Surface Preparation    $3.56 $4.20
721056   Water Well, Foundational, or Directional Drilling    $3.56 $4.20

Industry group: DD02 - General Construction
Classification unit:
CU # CU name 2007 Rate 2006 Rate
721038   Oil or Gas Pipeline Construction or Repair    $3.61 $4.30

1 Newly created classification unit.
2 New member for this industry group.

View the 2006 information for this rate group.

For more detailed information about this rate group see:

All rate group information